<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.tetrain.com/index.php?action=history&amp;feed=atom&amp;title=Spectra_Nagios_Project_Completion_Report</id>
	<title>Spectra Nagios Project Completion Report - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.tetrain.com/index.php?action=history&amp;feed=atom&amp;title=Spectra_Nagios_Project_Completion_Report"/>
	<link rel="alternate" type="text/html" href="https://wiki.tetrain.com/index.php?title=Spectra_Nagios_Project_Completion_Report&amp;action=history"/>
	<updated>2026-07-27T11:09:36Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.9</generator>
	<entry>
		<id>https://wiki.tetrain.com/index.php?title=Spectra_Nagios_Project_Completion_Report&amp;diff=4347&amp;oldid=prev</id>
		<title>Admin: Auto-created from uploaded PDF text extraction</title>
		<link rel="alternate" type="text/html" href="https://wiki.tetrain.com/index.php?title=Spectra_Nagios_Project_Completion_Report&amp;diff=4347&amp;oldid=prev"/>
		<updated>2026-07-26T16:27:11Z</updated>

		<summary type="html">&lt;p&gt;Auto-created from uploaded PDF text extraction&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&amp;#039;&amp;#039;Auto-generated from the uploaded PDF [[:File:Spectra_Nagios_Project_Completion_Report.pdf|Spectra_Nagios_Project_Completion_Report.pdf]]. This is an extracted-text rendering for searchability; see the original PDF for exact formatting, diagrams, tables, and images.&amp;#039;&amp;#039;&lt;br /&gt;
&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
&amp;lt;nowiki&amp;gt;&lt;br /&gt;
Project Completion Report&lt;br /&gt;
&lt;br /&gt;
Project Title: Nagios XI Upgrade and HA Implementation&lt;br /&gt;
Project Duration: March 2025 – June 2025&lt;br /&gt;
Prepared For: spectra.co&lt;br /&gt;
Prepared By: Tetra Information Services LTD.&lt;br /&gt;
Date: 03 July 2025&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Table of Contents&lt;br /&gt;
&lt;br /&gt;
  1.   Executive Summary&lt;br /&gt;
  2.   Project Objectives&lt;br /&gt;
  3.   Scope of Work&lt;br /&gt;
  4.   Implementation Timeline&lt;br /&gt;
  5.   Detailed Activities and Outcomes&lt;br /&gt;
          o Module 1: Design HA Architecture&lt;br /&gt;
          o Module 2: OS and Application Upgrade&lt;br /&gt;
          o Module 3: HA Configuration for Main&lt;br /&gt;
          o Module 4: HA Configuration for Probe&lt;br /&gt;
          o Module 5: Database Issue Resolution&lt;br /&gt;
          o Module 6: Main-Probe Synchronization&lt;br /&gt;
          o Module 7: API &amp;amp; Integration&lt;br /&gt;
          o Module 8: Hardware and Software Planning&lt;br /&gt;
  6.   Key Challenges &amp;amp; Resolutions&lt;br /&gt;
  7.   Recommendations&lt;br /&gt;
  8.   Conclusion&lt;br /&gt;
  9.   Appendices&lt;br /&gt;
&lt;br /&gt;
1. Executive Summary&lt;br /&gt;
&lt;br /&gt;
This report outlines the successful completion of the Nagios XI Upgrade and&lt;br /&gt;
High Availability (HA) Implementation project carried out for spectra.co by&lt;br /&gt;
Tetra Information Services LTD between March and June 2025.&lt;br /&gt;
&lt;br /&gt;
The goal was to revamp the monitoring system by upgrading the outdated&lt;br /&gt;
CentOS-based setup, introducing redundancy through HA configurations,&lt;br /&gt;
and improving reliability, database performance, and scalability. This project&lt;br /&gt;
aligns the system for anticipated growth over the next 3–5 years and&lt;br /&gt;
provides a resilient infrastructure to support 15,000+ hosts and over 150,000&lt;br /&gt;
monitored services.&lt;br /&gt;
&lt;br /&gt;
All modules planned under this initiative have been executed and validated&lt;br /&gt;
in collaboration with the client. Deliverables include new HA architecture,&lt;br /&gt;
upgraded OS/Nagios versions, optimized databases, real-time configuration&lt;br /&gt;
sync, and hardware recommendations for future scaling.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2. Project Objectives&lt;br /&gt;
&lt;br /&gt;
2.1 Core Objectives&lt;br /&gt;
&lt;br /&gt;
      To implement a robust and fault-tolerant High Availability (HA)&lt;br /&gt;
       configuration for both Main and Probe monitoring nodes.&lt;br /&gt;
      To upgrade the Operating System from CentOS 7 (EOL) to Ubuntu&lt;br /&gt;
       20.04 LTS.&lt;br /&gt;
      To upgrade Nagios XI from version 5.8.9 to the latest stable release,&lt;br /&gt;
       2024R1.4.4.&lt;br /&gt;
      To address database performance issues, backup failures, and table&lt;br /&gt;
       bloating.&lt;br /&gt;
      To ensure real-time synchronization between Main and Probe&lt;br /&gt;
       environments.&lt;br /&gt;
      To stabilize integration with API and Service Request (SR)&lt;br /&gt;
       automation tools.&lt;br /&gt;
&lt;br /&gt;
2.2 Key Deliverables&lt;br /&gt;
&lt;br /&gt;
      HA design documentation finalized with the client&lt;br /&gt;
      Clean OS installations and configuration&lt;br /&gt;
      Upgraded Nagios XI instances&lt;br /&gt;
      Master-Master MySQL Replication and DRBD setup&lt;br /&gt;
      Automated database cleanup configurations&lt;br /&gt;
      Resolved main-probe sync lags&lt;br /&gt;
      Reviewed and stabilized API/SR behavior&lt;br /&gt;
      Capacity roadmap to scale up to 150K services&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
3. Scope of Work&lt;br /&gt;
&lt;br /&gt;
The project scope included infrastructure redesign, HA implementation, and&lt;br /&gt;
full-stack upgrades with minimal downtime. The following major&lt;br /&gt;
components were included:&lt;br /&gt;
&lt;br /&gt;
      Planning and designing of Main/Probe HA infrastructure&lt;br /&gt;
      Execution of OS and Nagios XI upgrades on both nodes&lt;br /&gt;
      Re-establishing DRBD and MySQL replication clusters&lt;br /&gt;
      Resolving historical database errors&lt;br /&gt;
      Ensuring production-ready probe-main synchronization&lt;br /&gt;
      Addressing post-upgrade API/SR issues&lt;br /&gt;
      Providing a future hardware expansion strategy&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
4. Implementation Timeline&lt;br /&gt;
&lt;br /&gt;
Instead of a table, here’s the timeline as a step-wise breakdown with date&lt;br /&gt;
markers:&lt;br /&gt;
&lt;br /&gt;
      19–25 March 2025 – HA architecture finalized with Spectra&lt;br /&gt;
      26 March – 07 May 2025 – SOC (Secondary) Node OS and Nagios&lt;br /&gt;
       installation completed&lt;br /&gt;
      28 March – 13 May 2025 – Configuration and database migration to&lt;br /&gt;
       new node&lt;br /&gt;
      16–19 May 2025 – Switchover to new SOC node completed&lt;br /&gt;
      20–23 May 2025 – Primary Node OS/Nagios rebuilt and upgraded&lt;br /&gt;
      24 May – 10 June 2025 – Main and Probe HA clusters established&lt;br /&gt;
      10–25 June 2025 – Final testing, sync tuning, and hardware roadmap&lt;br /&gt;
       delivered&lt;br /&gt;
&lt;br /&gt;
Each activity followed strict checklists, supported by configuration&lt;br /&gt;
screenshots and validations reviewed by the client.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
5. Detailed Activities and Outcomes&lt;br /&gt;
&lt;br /&gt;
Module 1: HA Architecture Design&lt;br /&gt;
&lt;br /&gt;
      Multiple HA models were proposed, tested, and validated.&lt;br /&gt;
      Final decision involved using MySQL master-master replication&lt;br /&gt;
       and DRBD for file-level sync.&lt;br /&gt;
      No major new hardware purchases were required at this stage.&lt;br /&gt;
      Documentation of cluster failover scenarios was shared with Spectra.&lt;br /&gt;
&lt;br /&gt;
Module 2: OS and Application Upgrade&lt;br /&gt;
&lt;br /&gt;
2.1 HA Break and Initial Preparation&lt;br /&gt;
&lt;br /&gt;
      HA was temporarily disabled.&lt;br /&gt;
      Services temporarily shifted to the Main node.&lt;br /&gt;
&lt;br /&gt;
2.2 Secondary Node Installation&lt;br /&gt;
&lt;br /&gt;
      Ubuntu 22.04 LTS was first used, but changed to 20.04 LTS as per&lt;br /&gt;
       client feedback.&lt;br /&gt;
      Nagios XI 5.7 installed successfully, preparing for upgrade.&lt;br /&gt;
&lt;br /&gt;
2.3 Configuration Migration&lt;br /&gt;
&lt;br /&gt;
      Nagios configurations, DBs, custom scripts were moved from the old&lt;br /&gt;
       system.&lt;br /&gt;
      Data validation, backup recovery, and plugin compatibility tests were&lt;br /&gt;
       performed.&lt;br /&gt;
&lt;br /&gt;
2.4 SOC Go-Live&lt;br /&gt;
&lt;br /&gt;
      Final production cutover took place on 19 May 2025.&lt;br /&gt;
      Monitoring services resumed without loss of data or downtime.&lt;br /&gt;
&lt;br /&gt;
2.5 Primary Node Upgrade&lt;br /&gt;
&lt;br /&gt;
      Rebuilt Primary Node from scratch with Ubuntu 20.04 LTS.&lt;br /&gt;
      Upgraded Nagios XI to 2024R1.4.4.&lt;br /&gt;
      Configured DRBD and MySQL replication to secondary node.&lt;br /&gt;
&lt;br /&gt;
Module 3: HA Configuration – Main&lt;br /&gt;
&lt;br /&gt;
     Cluster fencing, shared IP configuration, and failover scripting&lt;br /&gt;
      implemented.&lt;br /&gt;
     DRBD replication verified for logs, configs, and backups.&lt;br /&gt;
     MySQL master-master pair synchronized and validated.&lt;br /&gt;
     All services continued without interruption during switchover&lt;br /&gt;
      simulations.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Module 4: HA Configuration – Probe&lt;br /&gt;
&lt;br /&gt;
     Probe node was duplicated and configured with identical packages.&lt;br /&gt;
     MySQL cluster and DRBD replication implemented as in Main node.&lt;br /&gt;
     Configured to handle real-time alerts and monitoring data from&lt;br /&gt;
      remote devices.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Module 5: Database Issue Resolution&lt;br /&gt;
&lt;br /&gt;
     Backups were previously failing due to large .ibd files and table&lt;br /&gt;
      locks.&lt;br /&gt;
     Old tables (over 5GB each) were split and purged with automation.&lt;br /&gt;
     Enabled automated cleanup scripts in Nagios XI.&lt;br /&gt;
     Post-cleanup system is stable, with backup jobs running nightly.&lt;br /&gt;
&lt;br /&gt;
Module 6: Main–Probe Synchronization&lt;br /&gt;
&lt;br /&gt;
     Prior to the upgrade, there were 15–20 minute lags in alarm sync.&lt;br /&gt;
     Post-upgrade, the sync is real-time, with instant propagation of&lt;br /&gt;
      changes.&lt;br /&gt;
     This led to faster deployment, reduced troubleshooting, and higher&lt;br /&gt;
      monitoring accuracy.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Module 7: API &amp;amp; Integration&lt;br /&gt;
&lt;br /&gt;
     SR automation previously created duplicate or missing records.&lt;br /&gt;
     Integration scripts were revalidated and corrected with vendor&lt;br /&gt;
      support.&lt;br /&gt;
     Delay in SR acknowledgment reduced from 5–10 mins to &amp;lt;2 mins on&lt;br /&gt;
      average.&lt;br /&gt;
     Final integration success rate is now above 97%.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Module 8: Hardware and Software Planning&lt;br /&gt;
&lt;br /&gt;
     Final architecture allows for growth up to 150K services.&lt;br /&gt;
     Main HA servers:&lt;br /&gt;
      / = 600GB, /data = 5.2TB, RAM = 128GB, vCPU = 12&lt;br /&gt;
     Probe nodes:&lt;br /&gt;
      / = 500GB, /data = 500GB, RAM = 32GB, vCPU = 4–6&lt;br /&gt;
     Hardware scaling roadmap provided and accepted by Spectra.&lt;br /&gt;
&lt;br /&gt;
6. Key Challenges &amp;amp; Resolutions&lt;br /&gt;
&lt;br /&gt;
      OS version conflict resolved by switching from 22.04 LTS to 20.04&lt;br /&gt;
       LTS.&lt;br /&gt;
      DRBD sync stalls fixed by tuning resource parameters.&lt;br /&gt;
      Partition size mismatches addressed via disk resizing.&lt;br /&gt;
      Backup failures resolved through database optimization.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
7. Recommendations&lt;br /&gt;
&lt;br /&gt;
      Continue monitoring synchronization and replication status weekly.&lt;br /&gt;
      Maintain quarterly health checks on MySQL size and HA logs.&lt;br /&gt;
      Keep probe configuration updated for future monitoring growth.&lt;br /&gt;
      Begin planning for cloud-based hybrid Nagios XI extension in 2026.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
8. Conclusion&lt;br /&gt;
&lt;br /&gt;
The project has been executed successfully and fulfills all design,&lt;br /&gt;
functionality, and availability expectations. The Nagios XI infrastructure is&lt;br /&gt;
now fault-tolerant, stable, and scalable for years to come.&lt;br /&gt;
&lt;br /&gt;
Final Handover Date: 25 June 2025&lt;br /&gt;
Project Closure Status: ✔ Fully Completed&lt;br /&gt;
&lt;br /&gt;
9. Appendices&lt;br /&gt;
&lt;br /&gt;
9.1 Reference Document List&lt;br /&gt;
&lt;br /&gt;
The following documents were created, reviewed, and shared with&lt;br /&gt;
spectra.co throughout the project lifecycle. Each document supports the&lt;br /&gt;
execution and validation of key modules in the HA architecture, upgrade&lt;br /&gt;
strategy, configuration, and optimization.&lt;br /&gt;
&lt;br /&gt;
   1. Proposed Monitoring Architecture – Spectra&lt;br /&gt;
      Describes the final HA design including main and probe node layout,&lt;br /&gt;
      resource planning, and IP failover strategy.&lt;br /&gt;
   2. Solution Document – Nagios HA Comparison with Architecture&lt;br /&gt;
      Diagram&lt;br /&gt;
      Provides comparative analysis of different HA deployment methods&lt;br /&gt;
      and justifies selected approach for Spectra.&lt;br /&gt;
   3. PCS Cluster Failover – Process&lt;br /&gt;
      Step-by-step documentation outlining cluster fencing, VIP migration,&lt;br /&gt;
      and automatic failover process validation.&lt;br /&gt;
   4. Spectra_SOC Nagios Optimization – Project Status (Final Sheet)&lt;br /&gt;
      Status tracking sheet showing all completed activities, timelines,&lt;br /&gt;
      dependencies, and mitigation actions.&lt;br /&gt;
   5. Nagios XI Cluster Setup Checklist&lt;br /&gt;
      Comprehensive deployment checklist used by engineers to ensure no&lt;br /&gt;
      step was missed during HA and sync configuration.&lt;br /&gt;
&amp;lt;/nowiki&amp;gt;&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;/div&gt;</summary>
		<author><name>Admin</name></author>
	</entry>
</feed>